INDIAN ARMED FORCES CHIEFS ON OUR RELENTLESS AND FOCUSED PUBLISHING EFFORTS

The insightful articles, inspiring narrations and analytical perspectives presented by the Editorial Team, establish an alluring connect with the reader. My compliments and best wishes to SP Guide Publications.

— General Upendra Dwivedi, Indian Army Chief

"Over the past 60 years, the growth of SP Guide Publications has mirrored the rising stature of Indian Navy. Its well-researched and informative magazines on Defence and Aerospace sector have served to shape an educated opinion of our military personnel, policy makers and the public alike. I wish SP's Publication team continued success, fair winds and following seas in all future endeavour!"

— Admiral Dinesh Kumar Tripathi, Indian Navy Chief

Since, its inception in 1964, SP Guide Publications has consistently demonstrated commitment to high-quality journalism in the aerospace and defence sectors, earning a well-deserved reputation as Asia's largest media house in this domain. I wish SP Guide Publications continued success in its pursuit of excellence.

— Air Chief Marshal A.P. Singh, Indian Air Force Chief
       

Five years grounded, Saras revs up to fly again

By SP's Special Correspondent
Photo Credit: DPR Defence

January 13, 2014: The Indian Air Force's premier testing facility, the Aircraft & Systems Testing Establishment (ASTE) has begun ground trials of the PT1N modified and souped-up first prototype. Top sources inform SP's that the Pt1N will be put through an extensive series of ground handling, turning and taxi trials, including static systems trials before it is cleared for a first flight.

The IAF has already appointed a pilot crew for the flight, likely to take place in February. The platform has remained on ground since the crash of the second prototype in March 2009, killing all three test personnel on board. As earlier reported by SP's, the modifications to the first prototype include changes to the rear fuselage, increased area rudder, modified stub wings, new engine nacelles and a crucial autopilot. A third prototype, incorporating full weight optimisation and an expanded ratio of composites in the build, is slated for a first flight later this year, after the PT1N clocks at least 25 flights. According to sources associated with the modification of the Saras, the aircraft had grave problems that have since been addressed. Even the ground trials could have commenced earlier, but for NAL's insistence that all simulated tests be corroborated on station before the platform was handed over to the ASTE for operational-level ground and flight testing.