INDIAN ARMED FORCES CHIEFS ON OUR RELENTLESS AND FOCUSED PUBLISHING EFFORTS

The insightful articles, inspiring narrations and analytical perspectives presented by the Editorial Team, establish an alluring connect with the reader. My compliments and best wishes to SP Guide Publications.

— General Upendra Dwivedi, Indian Army Chief

"Over the past 60 years, the growth of SP Guide Publications has mirrored the rising stature of Indian Navy. Its well-researched and informative magazines on Defence and Aerospace sector have served to shape an educated opinion of our military personnel, policy makers and the public alike. I wish SP's Publication team continued success, fair winds and following seas in all future endeavour!"

— Admiral Dinesh Kumar Tripathi, Indian Navy Chief

Since, its inception in 1964, SP Guide Publications has consistently demonstrated commitment to high-quality journalism in the aerospace and defence sectors, earning a well-deserved reputation as Asia's largest media house in this domain. I wish SP Guide Publications continued success in its pursuit of excellence.

— Air Chief Marshal A.P. Singh, Indian Air Force Chief

       

Deployment of AWACS

Issue No. 6 | March 16-31, 2013

Three airborne warning and control system (AWACS) aircraft are presently operationalised in the Indian Air Force (IAF). AWACS are meant as force multipliers for specific area cover and not for surveillance of the entire space of the country, the Defence Minister A.K. Antony has said.

All three AWACS are part of network-centric operations and are able to provide adequate coverage of specified areas in net-centric operations. Enhancement of airborne surveillance and command and control capabilities of IAF is sought to be achieved through procurement of additional AWACS.

To leverage the experience and expertise gained in the design and development of airborne early warning and control systems, a project proposal for indigenous development of AWACS (India) by DRDO has been approved by the Cabinet Committee on Security on February 12, 2013. The development of AWACS is envisaged to be completed in 84 months from the date of formal sanction of the programme.